Official-source planned outage information

TGSPDCL Scheduled Power Cuts & Shutdown Notices

Search currently stored provider-backed planned shutdown records for Southern Telangana service territory. PowerCutStatus keeps the official source attached to each record and does not infer that electricity is available when no matching notice is found.

Latest automatic source check

Latest source fetch failed

Last attempted check: 21 Oct 2026, 06:45 am IST

Last successful fetch: Not available

These timestamps describe access to provider notices. They do not establish supply at your connection. Missing records, failed checks and expired notice windows do not confirm that power is available.

Latest official-source snapshot

Search scheduled shutdown notices

Search affected area, locality, feeder or maintenance description. Results only reflect records successfully parsed from the current official-source snapshot.

Stored provider records: 0
Last source check: 21 Oct 2026, 6:45 am
Parser/source check: Not confirmed
The latest official scheduled-outage source could not be confirmed.

PowerCutStatus will not treat a source failure or missing data as proof that electricity is available. Use the official provider links below for a direct check.

Check current outage complaints on TGSPDCL ↗
TGSPDCL current outage complaints

Circle-wise open power-outage grievances

This is a separate official TGSPDCL dashboard from the scheduled-maintenance report. It shows currently open power-outage grievances by circle and complaint channel; it should not be interpreted as a feeder-level outage map.

Open grievances: Unavailable
Official update: Not available
Auto-refresh: Every 5 minutes
The TGSPDCL current-outage dashboard could not be parsed at this check. Use the official dashboard link below for the direct source.

Official shutdown source

PowerCutStatus has a verified parser path for this provider’s official planned-outage source. Matching still depends on the notice containing enough area or feeder detail.

What the table can contain

  • • affected area/locality as published by the provider
  • • feeder or substation context where exposed
  • • planned start and expected end time
  • • maintenance reason/work description where exposed
  • • direct official source link and source-check timestamp

Missing fields are left unknown rather than inferred.

Scheduled outage vs unexpected power cut

A scheduled shutdown is planned maintenance published by the electricity provider. An unexpected outage can happen without a planned notice. If no scheduled notice is found, PowerCutStatus does not treat that as proof that electricity supply is normal.

Verified source notes

Official scheduled outage report exposes date, circle, division, subdivision, section, voltage, town, substation, feeder, affected area, From/To and maintenance type. TGSPDCL also exposes a separate official power-outage grievance dashboard for current open outage complaints.

Related outage pages

Related local coverage

Hyderabad: source health and area checks